Repairs scheduled for Interstate 75 in Scott County

Scott County

District 7 Structures Personnel

LEXINGTON, Ky. (Oct. 9, 2025)  The Kentucky Transportation Cabinet (KYTC) advises motorists of scheduled bridge deck pothole repairs. The work will take place on Interstate 75.

Interstate 75Northbound

Tuesday, Oct. 146 p.m. until 12 a.m.

  • bridge deck repairs will be in effect at milepoint 128
  • the location will be the left/fast two lanes approximately 2 miles north of Exit 126

Motorists in Kentucky may report potholes for state routes through the following:

  • Toll free:  1-877-FOR-KYTC (1-877-367-5982)

“Contact Us” menu at the top of the KYTC website found here:http://transportation.ky.gov or via this link: https://bpm.kytc.ky.gov/appbuilder/forms?code=810A005056A2147711773A3B03F6EFEF&Process=PA-DV-ReportAPothole

All work and/or closures are scheduled on a tentative basis and subject to change depending on weather, emergencies and other factors beyond the control of the Department of Highways.

District 7 includes: Anderson, Bourbon, Boyle, Clark, Fayette, Garrard, Jessamine, Madison, Mercer, Montgomery, Scott and Woodford Counties

Keep up with the Kentucky Transportation Cabinet:

Navigate traffic with GoKY or via Waze on your smartphone!

 

 

###


Founded & published by