
Asphalt resurfacing LEXINGTON, Ky. (August 29, 2025) – The Kentucky Transportation Cabinet (KYTC) advises motorists of asphalt resurfacing operations scheduled for Woodford County. Lane closures will be in place and flaggers will assist with traffic control. Motorists will be able to pass through the work zone. Monday, Sept. 8 through Friday, Sept. 12 – 7 p.m.…

Asphalt resurfacing LEXINGTON, Ky. (August 29, 2025) – The Kentucky Transportation Cabinet (KYTC) advises motorists of asphalt resurfacing operations scheduled for Scott County. Lane closures will be in place and flaggers will assist with traffic control. Motorists will be able to pass through the work zone. Monday, Sept. 8 through Friday, Sept. 12 – 7…

Pavement work shifts to northern section, mile markers 92-98, after Labor Day LEXINGTON, Ky. (August 28, 2025) – Work is progressing on the Kentucky Transportation Cabinet’s $13.5 million Interstate 75 safety and pavement improvement project in Madison County, with construction now shifting from the southern section to the northern section of the project. Contractors remain restricted…

Storm drain repair operations LEXINGTON, Ky. (August 28, 2025) – The Kentucky Transportation Cabinet (KYTC) advises motorists of a temporary closure scheduled for Old Richmond Road/KY 2328. The closure is necessary for storm drain repair operations. Tuesday, Sept. 2 and Wednesday, Sept. 3 – 9 a.m. until 3 p.m. each day Old Richmond Road/KY 2328 a…

New Circle Road Thursday, August 28 – Friday, August 29 Nighttime closures 7 p.m. through 5 a.m. LEXINGTON, Ky. (August 27, 2025) – Construction for the New Circle Road (KY 4) Widening project in Lexington will require temporary overnight lane closures on New Circle Road between Georgetown Road (US 25) and Leestown Road (US 421)…

Cross drain replacement LEXINGTON, Ky. (August 26, 2025) – The Kentucky Transportation Cabinet (KYTC) advises motorists that work is scheduled in Madison County. The operations are for cross drain replacement operations. Thursday, August 28 – 8:30 a.m. until 3 p.m. Speedwell Road/KY 374 the route will be closed at milepont 0.0 (the intersection) the location for…

Asphalt resurfacing for US 150/Perryville Road LEXINGTON, Ky. (August 24, 2025) – The Kentucky Transportation Cabinet (KYTC) advises motorists of asphalt resurfacing operations for US 150/Perryville Road in Boyle County. Lane closures will be in effect with flaggers assisting with traffic control. Monday, August 25 through Saturday, Nov. 15 Intersection work will be completed: 7 p.m.…

New Circle Road (KY 4) Tuesday, August 26 Expect delays on New Circle Road between 10 p.m. – 5 a.m. LEXINGTON, Ky. (August 22, 2025) – Construction for the New Circle Road (KY 4) Widening project in Lexington will require temporary overnight road closures on New Circle Road on Tuesday, August 26. The closures will allow…

Thermoplastic markings LEXINGTON, Ky. (August 22, 2025) – The Kentucky Transportation Cabinet (KYTC) advises motorists that thermoplastic marking operations are scheduled. Markings include stop bars, crosswalks and arrows. The markings improve reflectivity, and visibility which enhance safety. Flaggers will be onsite to guide and direct traffic. Motorists can pass through the work zones. Scott County…

New Circle Road/KY 4 in Fayette County Routine bridge deck maintenance LEXINGTON, Ky. (August 21, 2025) – The Kentucky Transportation Cabinet (KYTC) advises motorists of scheduled operations for New Circle Road/KY 4. The work is necessary for routine bridge deck repairs. Tuesday, August 26 – 9 a.m. until 3 p.m. New Circle Road/KY 4 – Westbound…