Motorists are advised to slow down, watch for crews working
LEXINGTON, Ky. (March 20, 2026) — The Kentucky Transportation Cabinet (KYTC) advises motorists of scheduled pothole repairs on Interstate 75 in Fayette County. Rolling roadblocks (a mobile operation) will be utilized beginning at 9 a.m. on Monday, March 23. Temporary traffic delays of up to 15 minutes are possible during operations. Motorists are advised to watch for signage and personnel in the area.
Interstate 75 – Northbound and Southbound
Northbound
- Operations will take place between milepoints 111 and 115 from 9 a.m. to noon.
Southbound
- Operations will take place between milepoints 115 and 111 from 11 a.m. to 2 p.m.
Rolling roadblocks will be conducted with law enforcement in each lane assisting with traffic control.
All work and/or closures are scheduled on a tentative basis and are subject to change depending on weather, emergencies, and other factors beyond the control of the Department of Highways.
For traffic updates and live traffic cameras, visit GoKY.ky.gov.
District 7 includes Anderson, Bourbon, Boyle, Clark, Fayette, Garrard, Jessamine, Madison, Mercer, Montgomery, Scott and Woodford Counties.




