
LEXINGTON, Ky. (July 14, 2025) – Construction for the I-75 widening project in Lexington will require a temporary overnight single lane closure on Tuesday, July 15. This lane closure will allow contractors to place beams over the RJ Corman railroad. Beginning at 7 p.m. Tuesday, contractors will close one lane of Paris Pike northbound…

LEXINGTON, Ky. (July 11, 2025) — The University of Kentucky Martin-Gatton College of Agriculture, Food and Environment (CAFE), with leadership from UK Ag Equine Programs and the Department of Animal and Food Sciences, recently partnered with France’s UniLaSalle — inviting a group of their students pursuing an Executive Master’s degree in Equine Science and Business…

District 7 Structures Personnel LEXINGTON, Ky. (July 11, 2025) – The Kentucky Transportation Cabinet (KYTC) advises motorists of rescheduled pothole work. Routine repairs will take place for a bridge deck located on Interstate 75 in Fayette County. Interstate 75 – Southbound Tuesday, July 15 – 6 p.m. until 12 a.m. two left lane closures will be…

Full closure of Aphids Way planned EXINGTON, Ky. (July 11, 2025) – As part of the ongoing Richmond Road Improvement Project in Fayette County, Aphids Way will be fully closed to all traffic starting Monday, July 14, 2025. This closure is necessary to construct the new, widened alignment of Aphids Way, a critical component of the…

Thermoplastic markings LEXINGTON, Ky. (July 11, 2025) – The Kentucky Transportation Cabinet (KYTC) advises motorists that thermoplastic marking operations are scheduled for Jessamine County. Markings include stop bars, crosswalks and arrows. The markings improve reflectivity, and visibility which enhance safety. Flaggers will be onsite to guide and direct traffic. Motorists can pass through the work…

Milling and paving LEXINGTON, Ky. (July 10, 2025) – The Kentucky Transportation Cabinet (KYTC) advises motorists of scheduled resurfacing operations for Main Street in Lexington. Milling work will begin between Midland Avenue and Newtown Pike. Milling is the process of removing the existing asphalt surface. Resurfacing (adding a new top layer of asphalt) will begin once…

Daily lane closures possible from Man O’ War Boulevard to Ashley Woods Drive LEXINGTON, Ky. (July 10, 2025) – Construction continues this week along Richmond and Athens-Boonesboro roads (U.S. 25 and KY 418) in Lexington for safety and traffic flow improvements. Motorists should expect traffic shifts and lane closures from Man O’ War Boulevard to Ashley…

LEXINGTON, Ky.— A Georgetown, Ky., man, Robert Conley, 71, has pleaded guilty before U.S. District Judge Karen Caldwell to providing a criminally false claim in order to obtain COVID relief funds. In 2020, the Coronavirus Aid, Relief, and Economic Security (CARES) Act, passed in response to the COVID-19 pandemic, established many programs that were funded…

District 7 Structures Personnel LEXINGTON, Ky. (July 9, 2025) – The Kentucky Transportation Cabinet (KYTC) advises motorists that this news release serves as an update. Routine pothole repair work will be rescheduled due to the forecast of inclement weather. The work described below will not take place this evening and will be rescheduled. Interstate 75…

Cross drain replacement operations LEXINGTON, Ky. (July 9, 2025) – The Kentucky Transportation Cabinet (KYTC) advises motorists of a scheduled closure for Pinckard Pike/KY 169. The temporary closure is necessary for cross drain installation operations. Thursday, June 10 – 6 a.m. until 9 a.m. Pinckard Pike/KY 169 – East & Westbound a closure for cross drain…