
Milling and paving LEXINGTON, Ky. (July 17, 2025) – The Kentucky Transportation Cabinet (KYTC) advises motorists that this news release serves as a reminder. Resurfacing operations are scheduled for Main Street in Lexington. The project will be located between Midland Avenue and Newtown Pike. Milling work will begin first. Milling is the process of removing the…

Intersection of Man O War Boulevard/KY 1425 and Polo Club Boulevard LEXINGTON, Ky. (July 16, 2025) – The Kentucky Transportation Cabinet (KYTC) advises motorists that thermoplastic marking operations are scheduled for Fayette County. Markings include stop bars, crosswalks and arrows. The markings improve reflectivity, and visibility which enhance safety. Thursday, July 17 – 10 a.m. until…

The bridge located over Grassy Lick Creek LEXINGTON, Ky. (July 16, 2025) – The Kentucky Transportation Cabinet (KYTC) advises motorists of a closure in effect for the bridge on Aarons Run Road/KY 3362 in Montgomery County. The structure is located over Grassy Lick Creek. It is a 48’ single span prestressed box beam bridge constructed…

Fayette County District 7 Structures Personnel LEXINGTON, Ky. (July 14, 2025) – The Kentucky Transportation Cabinet (KYTC) advises motorists of scheduled pothole work. Routine repairs will take place for a bridge deck located on Interstate 75 in Fayette County. Interstate 75 – Northbound Wednesday, July 16 – 6 p.m. until 12 a.m. the two right…

LEXINGTON, Ky. (July 14, 2025) – Construction for the I-75 widening project in Lexington will require a temporary overnight single lane closure on Tuesday, July 15. This lane closure will allow contractors to place beams over the RJ Corman railroad. Beginning at 7 p.m. Tuesday, contractors will close one lane of Paris Pike northbound…

Improvements for Main Street and the Maysville Road Intersection LEXINGTON, Ky. (July 14, 2025) – The Kentucky Transportation Cabinet (KYTC) advises motorists of a scheduled improvement project for Mt. Sterling. The work will include resurfacing and sidewalk reconstruction. Motorists can pass through the work zone and flaggers will be onsite at specific times to direct traffic.…

District 7 Structures Personnel LEXINGTON, Ky. (July 11, 2025) – The Kentucky Transportation Cabinet (KYTC) advises motorists of rescheduled pothole work. Routine repairs will take place for a bridge deck located on Interstate 75 in Fayette County. Interstate 75 – Southbound Tuesday, July 15 – 6 p.m. until 12 a.m. two left lane closures will be…

Full closure of Aphids Way planned EXINGTON, Ky. (July 11, 2025) – As part of the ongoing Richmond Road Improvement Project in Fayette County, Aphids Way will be fully closed to all traffic starting Monday, July 14, 2025. This closure is necessary to construct the new, widened alignment of Aphids Way, a critical component of the…

Thermoplastic markings LEXINGTON, Ky. (July 11, 2025) – The Kentucky Transportation Cabinet (KYTC) advises motorists that thermoplastic marking operations are scheduled for Jessamine County. Markings include stop bars, crosswalks and arrows. The markings improve reflectivity, and visibility which enhance safety. Flaggers will be onsite to guide and direct traffic. Motorists can pass through the work…

Milling and paving LEXINGTON, Ky. (July 10, 2025) – The Kentucky Transportation Cabinet (KYTC) advises motorists of scheduled resurfacing operations for Main Street in Lexington. Milling work will begin between Midland Avenue and Newtown Pike. Milling is the process of removing the existing asphalt surface. Resurfacing (adding a new top layer of asphalt) will begin once…